Skip to main content

How long does it take to build a website?

6 min read

Short answer

A simple website for a small business is usually ready in a few weeks, while an online store or a larger site takes longer. The biggest factor isn't programming but how quickly texts, photos and feedback arrive. That's why the deadline is counted from the moment the material arrives, and the exact deadline is written in the quote.

Online you'll find promises like “a website in 3 days” and stories of projects that drag on for half a year. The truth is somewhere in between, and it depends more on preparation than on the build itself. Here's the path from the first conversation to a live website.

Stages of building a website

  1. 1Conversation and quote. We agree on what the site should do, how many pages it has and what's included. You get a written quote with a deadline.
  2. 2Gathering material. You send the logo, texts, photos and contact details. The full checklist is in What do you need to prepare to build a website.
  3. 3Design. We design the home page and send it for review. Once we agree on the style, the other pages go faster.
  4. 4Build. The site is built to load fast and look good on phones, tablets and computers.
  5. 5Testing. We go through every page, form and link on several devices. You review the site and send changes.
  6. 6Launch. The site goes live on your domain, gets set up for Google, and you receive a short guide.

Roughly: how long each type of site takes

  • One-page site — the fastest, often a couple of weeks once the material is ready.
  • Business website with several pages — a bit longer, since every page needs text, design and testing.
  • Online store or catalogue — the longest, because of adding products, payments and delivery.

The types of sites and what each includes are listed on the Pricing page.

Why does the deadline start only when the material arrives?

Because it's the only fair way. If the deadline starts on the day we agree and the texts arrive a month later, the site can't be finished on time — and nobody is to blame. When we count from the moment we have everything we need, both you and we know exactly when the site will be ready.

How to get your website finished sooner

  • prepare the material in advance, in one folder,
  • choose one person who makes decisions — a site approved by five people takes five times longer,
  • send examples of websites you like,
  • send changes all at once, in one message, not one by one,
  • start with what you have — the site can be expanded after launch.

What happens after launch?

A website is never finished forever. After launch you get free support for a set number of days, and later changes can go through maintenance or be agreed separately. If being found on Google matters to you, remember that it also takes time — more in How to get your website on Google.

When could your website be ready?

Tell us what kind of site you need and what material you already have — the quote will include an exact deadline.

Request a quote

Contact

Tell us what you need — we'll get back with a proposal.

We work from Belgrade, and working together online is just as easy, wherever you are. For a quick reply, tell us in your message what you do and what you expect from the website.

Request a quote

Fill in the form and we'll prepare a proposal. Fields marked with an asterisk are required.

At least 20 characters — enough for us to understand what it's about.

We reply to enquiries as soon as possible, on working days.